建设项目建成验收意见书
建设项目建成验收意见书工程范围
建筑层数/总高万结算总造价面积度(M)
设防结构特点最大跨度烈度
基础设计有效地基持力层形式选用年限
规划许可证施工许可证实际开实际竣2验收日期工时间工时间
单位名称许可等级法定代表人项目负责人
工程共建建设单位开展
各方监理
单位乙级
设计
甲级单位
勘察
单位乙级
施工
单位贰级
隐蔽验隐蔽验收记录与项目同步资料真正具体可体现项目实际状况,收情况各方签字盖章齐全。
安全、功能
根据工程实际状况共检查项目健康和用途检验资料均具备效率验收标准。检验(抽查)情
况
工程竣工
该项目品质保障资料、隐蔽验收记录、检验批验收记录、分项分部项目验收记录均技术资料
核查情况与项目同步且详细齐全。
工程观感
质量检查项目观感质量共检测13项,每项抽查5-10个点,均可满足品质验收标准。验收意见
of transport and the custody 4。1。2。1。1 cable in transport process in the not should makes cable and the cable disc by injury, is strictly prohibited will cable disc directly by car Shang push Xia, cable disc not should flat put transport and the storage; transport and the scroll cable disc Qian, must guarantee cable disc firm, cable around tight, and Must follow when scrolling arrows on the cable drum instructions or entangle the cable direction。 And its annexes 4。1。2。1。2 cable arrived at the scene, checks should be carried out promptly, the technical documentation of the products should be complete, cable length should conform to the drawings, specifications, requirements, attachments should be complete, cable termination should be tight。
4。1。2。1。3 cable should focus on the store, and shall identify the model, specification。 Storage cables should be dry, without water。 4。1。2。2 of cable protection pipe processing and laying 4。1。2。2。1 cable protection pipe must be perforated, cracks and significant depressions, smooth inside walls should be, cable protection pipe may not have severe corrosion, susceptible to mechanical damage and buried at the larger force, sufficient strength of pipe should be used。 4。1。2。2。2 cable protection tube processing, the tube free of burrs and sharp edges and corners, and trumpet。
Cable protection pipe after bending, there should be no cracks, the degree of bend flat should not be bigger than the outside diameter of the pipe 10%; cable protection pipe bend radius should not be less than the penetration of the minimum permissible bending radius of the cable。 Cable protection pipe inner diameter and outer diameter of the cable than not 。。。 Hurt, well insulated。 4。1。4。2 cable lines should be placed securely, strength and length of the steel shaft should tie in with cable reel weight and width。
Before laying should be calculated according to the design and the physical path length of each cable, arrange each cable, reducing the cable connectors。 4。1。4。3 cable spacing of the support
1/16页
主要使用用途该项目大致使用功能具备效率验收统一标准。
检查结果
监督机构责今施工过程中监管机构提出整顿项目均按规定进行整改,整改时间迅速,结果符合规整顿思路整改范规定。
情况
按图纸设计及更改的提出在要求的时间外完成全部协议承诺的项目内容,完成工程设计
与协议承诺外且经过相关部门的复核装修竣工验收意见书,验收结果遵循设计、施工规范、及国家检测标准的要求。容情况
保修书未按协议及相关细化的规定签订项目品质保修书。签署情况
消防、环保验收合格验收情况
工程款按协议工程款有未按合同收款。支付状况
验该项目经改造、设计、监理、施工共同检查考核,并共同商定验收结论指出:
收
意该项目品质符合规定,通过验收。
见
年月日
备
注
建设单位施工单位设计单位勘察单位:施工单位:
验(公章)(公章)(公章)(公章)(公章)
收
小
组
成负责人:负责人:负责人:负责人:负责人:
员(签章)(签章)(签章)(签章)(签章)
of transport and the custody 4。1。2。1。1 cable in transport process in the not should makes cable and the cable disc by injury, is strictly prohibited will cable disc directly by car Shang push Xia, cable disc not should flat put transport and the storage; transport and the scroll cable disc Qian, must guarantee cable disc firm, cable around tight, and Must follow when scrolling arrows on the cable drum instructions or entangle the cable direction。 And its annexes 4。1。2。1。2 cable arrived at the scene, checks should be carried out promptly, the technical documentation of the products should be complete, cable length should conform to the drawings, specifications, requirements, attachments should be complete, cable termination should be tight。
4。1。2。1。3 cable should focus on the store, and shall identify the model, specification。 Storage cables should be dry, without water。 4。1。2。2 of cable protection pipe processing and laying 4。1。2。2。1 cable protection pipe must be perforated, cracks and significant depressions, smooth inside walls should be, cable protection pipe may not have severe corrosion, susceptible to mechanical damage and buried at the larger force, sufficient strength of pipe should be used。 4。1。2。2。2 cable protection tube processing, the tube free of burrs and sharp edges and corners, and trumpet。
Cable protection pipe after bending, there should be no cracks, the degree of bend flat should not be bigger than the outside diameter of the pipe 10%; cable protection pipe bend radius should not be less than the penetration of the minimum permissible bending radius of the cable。 Cable protection pipe inner diameter and outer diameter of the cable than not 。。。 Hurt, well insulated。 4。1。4。2 cable lines should be placed securely, strength and length of the steel shaft should tie in with cable reel weight and width。
Before laying should be calculated according to the design and the physical path length of each cable, arrange each cable, reducing the cable connectors。 4。1。4。3 cable spacing of the support
2/16页
施工单位项目品质评价报告工程名称施工单位建筑面积层数/总厚度最大跨度结构特点基础模式
设计有效使用地基持力层设防烈度
年限
基础选用钢筋砼独立跟圆形基础.框混结构..施工所用的材料均两证齐全,地基与基础按规定留设各类试块且试块质量及汇总评定均具备国家完善规定.
所含各分项工程均考核合格.质量控制资料合格且记录清晰、真实、安全及和主体品质功能测试资料记录数据真正合理、签章齐全。
地基与基础分部及主体分部均由发展单位组织各方共同考核,并经抽检结构
评价实体厚度合格。总体评估质量合乎国家要求批准验收。
本项目共含地基与基础、主体、装饰和装修、屋面、建筑给排水及供热、建筑机电六个分部。其中分项工程所含的检验批均考核合格且品质验收记录清晰。分项分部工分部工程所含的分项工程均考核合格。质量控制资料完整、有效。安全及用途测试资料均合格。抽检符合完善的要求,观感质量各分部均评定为好。分部项目由发展程品质评价单位组织各方验收合格。
技术资料工程质量控制资料和安全功能资料经检查,均清晰,组卷归档符合规定。整理评价
施工图执行严谨按施工图及设计更改程序施工
情况
监理监控过程与施工同步进行装修别墅装修公司,及时正确的监测施工步骤中的各个环节。对于监理与施工结
重要部位实行旁站监理,跟班作业,如混凝土项目。各分项工程均于开工前24小合评价时外进行报验,完工后现场考核合格后方能进行上道工序。
竣工观感验收该项目观感验收符合品质合格要求,已通过考核。评价
施工单位:(公章)
施工单位负责人:(签字)
项目负责人:(签字)
年月日of transport and the custody 4。1。2。1。1 cable in transport process in the not should makes cable and the cable disc by injury, is strictly prohibited will cable disc directly by car Shang push Xia, cable disc not should flat put transport and the storage; transport and the scroll cable disc Qian, must guarantee cable disc firm, cable around tight, and Must follow when scrolling arrows on the cable drum instructions or entangle the cable direction。 And its annexes 4。1。2。1。2 cable arrived at the scene, checks should be carried out promptly, the technical documentation of the products should be complete, cable length should conform to the drawings, specifications, requirements, attachments should be complete, cable termination should be tight。
4。1。2。1。3 cable should focus on the store, and shall identify the model, specification。 Storage cables should be dry, without water。 4。1。2。2 of cable protection pipe processing and laying 4。1。2。2。1 cable protection pipe must be perforated, cracks and significant depressions, smooth inside walls should be, cable protection pipe may not have severe corrosion, susceptible to mechanical damage and buried at the larger force, sufficient strength of pipe should be used。 4。1。2。2。2 cable protection tube processing, the tube free of burrs and sharp edges and corners, and trumpet。
Cable protection pipe after bending, there should be no cracks, the degree of bend flat should not be bigger than the outside diameter of the pipe 10%; cable protection pipe bend radius should not be less than the penetration of the minimum permissible bending radius of the cable。 Cable protection pipe inner diameter and outer diameter of the cable than not 。。。 Hurt, well insulated。 4。1。4。2 cable lines should be placed securely, strength and length of the steel shaft should tie in with cable reel weight and width。
Before laying should be calculated according to the design and the physical path length of each cable, arrange each cable, reducing the cable connectors。 4。1。4。3 cable spacing of the support
3/16页
监理单位项目品质评价报告工程名称施工单位建筑面积层数/总厚度最大跨度结构特点基础类别
设计有效使用地基持力层设防烈度年限
施工项目监各项原材料报验资料、隐蔽验收资料、施工文件报建资料、现场质量管理资
料、及分部分项、施工放样等验收资料完整、真实且全数合格,能体现工程的品质理状态简述及施工步骤
合同履约已按与发展单位签定的监理合同承诺内容,认真履行了项目监理职责。情况
由现场施工提供的本项目的施工资料记录清晰与项目同步进行,能够体现项目监理资料实体。对各个施工环节的监测程序严格有效。能够逐步、细致、合理的体现出工程
情况各个施工程序的施工质量。
工程质量资料资料提交认真,内容清晰、签章齐全、与施工同步进行能准确的督导施工,与考核结论要理性客观的体现实体。本项目具备规定批准验收。
监理单位:(公章)
总监理工程师:(签字)
单位负责人:(签字)
年月日
of transport and the custody 4。1。2。1。1 cable in transport process in the not should makes cable and the cable disc by injury, is strictly prohibited will cable disc directly by car Shang push Xia, cable disc not should flat put transport and the storage; transport and the scroll cable disc Qian, must guarantee cable disc firm, cable around tight, and Must follow when scrolling arrows on the cable drum instructions or entangle the cable direction。 And its annexes 4。1。2。1。2 cable arrived at the scene, checks should be carried out promptly, the technical documentation of the products should be complete, cable length should conform to the drawings, specifications, requirements, attachments should be complete, cable termination should be tight。
4。1。2。1。3 cable should focus on the store, and shall identify the model, specification。 Storage cables should be dry, without water。 4。1。2。2 of cable protection pipe processing and laying 4。1。2。2。1 cable protection pipe must be perforated, cracks and significant depressions, smooth inside walls should be, cable protection pipe may not have severe corrosion, susceptible to mechanical damage and buried at the larger force, sufficient strength of pipe should be used。 4。1。2。2。2 cable protection tube processing, the tube free of burrs and sharp edges and corners, and trumpet。
Cable protection pipe after bending, there should be no cracks, the degree of bend flat should not be bigger than the outside diameter of the pipe 10%; cable protection pipe bend radius should not be less than the penetration of the minimum permissible bending radius of the cable。 Cable protection pipe inner diameter and outer diameter of the cable than not 。。。 Hurt, well insulated。 4。1。4。2 cable lines should be placed securely, strength and length of the steel shaft should tie in with cable reel weight and width。
Before laying should be calculated according to the design and the physical path length of each cable, arrange each cable, reducing the cable connectors。 4。1。4。3 cable spacing of the support
4/16页
设计单位项目品质评价报告工程名称施工单位建筑面积层数/总厚度最大跨度结构特点基础类别
设计有效使用地基持力层设防烈度年限
地基基础资料及各项签证齐全;资料表明内容与实体相吻合。验收评价
成品砼及地面外观品质符合规定;
主体结构资料做到交圈对口装修竣工验收意见书,各项内容记录清晰、真实。验收评价成品砼及地面外观品质符合规定;
按规定留置试块,且试块评定合格。
施工图施工图纸经抗震及设计审批,均具备规定,各项证件齐全。审查情形
工程资料资料记录内容清晰,与设计内容及完善相符合,变更及施工签证齐全。评价
竣工观感工程观感质量均可满足品质验收标准。验收评价
设计单位(公章)
设计单位负责人:(签字)
工程设计人:(签字)
年月日
of transport and the custody 4。1。2。1。1 cable in transport process in the not should makes cable and the cable disc by injury, is strictly prohibited will cable disc directly by car Shang push Xia, cable disc not should flat put transport and the storage; transport and the scroll cable disc Qian, must guarantee cable disc firm, cable around tight, and Must follow when scrolling arrows on the cable drum instructions or entangle the cable direction。 And its annexes 4。1。2。1。2 cable arrived at the scene, checks should be carried out promptly, the technical documentation of the products should be complete, cable length should conform to the drawings, specifications, requirements, attachments should be complete, cable termination should be tight。
4。1。2。1。3 cable should focus on the store, and shall identify the model, specification。 Storage cables should be dry, without water。 4。1。2。2 of cable protection pipe processing and laying 4。1。2。2。1 cable protection pipe must be perforated, cracks and significant depressions, smooth inside walls should be, cable protection pipe may not have severe corrosion, susceptible to mechanical damage and buried at the larger force, sufficient strength of pipe should be used。 4。1。2。2。2 cable protection tube processing, the tube free of burrs and sharp edges and corners, and trumpet。
Cable protection pipe after bending, there should be no cracks, the degree of bend flat should not be bigger than the outside diameter of the pipe 10%; cable protection pipe bend radius should not be less than the penetration of the minimum permissible bending radius of the cable。 Cable protection pipe inner diameter and outer diameter of the cable than not 。。。 Hurt, well insulated。 4。1。4。2 cable lines should be placed securely, strength and length of the steel shaft should tie in with cable reel weight and width。
Before laying should be calculated according to the design and the physical path length of each cable, arrange each cable, reducing the cable connectors。 4。1。4。3 cable spacing of the support
5/16页
居众装饰,始于1996年,专注于新房装修,旧房改造、设计施工等领域,具有国家建设部颁发的设计甲级,施工壹级的资质。(需要设计装修的业主,可以留下您的联系方式报名,装修顾问将会贴心联系您。)
- 上一篇:建设项目建成验收意见书已出来进场装修有啥隐患?
- 下一篇:找法网(findlaw)